Mn/DOT Updates Traffic Signal Timings Along Hwy 55

In response to the start of CenterPoint Energy’s Stage 2 construction at Hwy 55 and Winnetka Ave in Golden Valley, the Minnesota Department of Transportation (Mn/DOT) has updated coordination and timing of the Hwy 55 traffic signals between Hwy 100 and Hwy 169.The revised signal timings should mean fewer delays for motorists traveling along and across Hwy 55. Even though traffic signals timings have been updated, motorists should still expect significant delays during peak hour drive times and are advised to take alternate routes.

For real-time traveler information anywhere in Minnesota, visit 511mn.org or dial 511.

This entry posted in | Physical Development