Pedestrian Bridge Dividing Crystal And Golden Valley Reopens

The bridge that carries the Bassett Creek Trail between Crystal and Golden Valley has reopened after being closed for handrail painting. 

The painting required total removal of the rails so painting could be done off site. For safety reasons, the bridge remained closed until the railing was reinstalled.

For more information, contact the City of Golden Valley Physical Development Department at 763-593-8030.

This entry posted in | Physical Development